+1-800-578-1245
|
Contact us
|
Need help
Released on 30-07-2020

ANSI Lockout Tagout Signs and Labels

Lockout-Tagout hazards are among the most-cited workplace safety violations. Protect you workers - and your business - with our ANSI format lockout-Tagout signs and labels. Topics include hazardous voltage, machine lock out, power disconnects, cover warnings and more to help keep your workplace safe from unexpected machine operation.

  • US-Made signs include a protective laminate layer that resists moisture, abrasion, UV and chemicals

  • Available in 6 sizes and 4 materials: aluminum, PVC plastic, vinyl labels and magnetic backing

  • Signs conform to ANSI Z535.1 standards for Safety Color Code

1 - 100 of 127 Signs
Grid List
Signs Ranked by: Popularity |  Language |  Color |  A-Z

Electrical hazard Lockout/tagout before servicing

AWE-50420
Quick add

Conveyors must be locked out before entering under table

ACE-50012
Quick add

Crane lockout

ANE-28310
Quick add

Main air release and lock out point

ANE-32912
Quick add

Car dumper must be locked out before walking across

ANE-38796
Quick add

Este equipamiento se enciende automáticamente Se requiere bloquear la fuente de energía antes de retirar las cubiertas o barreras

ACS-9515
Quick add

Never enter bin while equipment is operating Augers travel at increasing speed when bin is emptied Failure to heed this warning may cause serious injury or death Lock-Out/Tag-Out all equipment Use a safety harness and safety line Wear a dust respirator Avoid the center of the bin Station a person to help from the outside of the bin

AWE-25376
Quick add

Never enter bin while equipment is operating Augers travel at increasing speed when bin is emptied Failure to heed this warning may cause serious injury or death Lock-Out/Tag-Out all equipment Use a safety harness and safety line Wear a dust respirator Avoid the center of the bin Station a person to help from the outside of the bin

ADE-25376
Quick add

Lockout tagout power before servicing, repairing or cleaning equipment

ADE-16478
Quick add

Follow lockout tagout procedures before entering

AWE-16477
Quick add

Lock out/Tag out Remove key & secure hydraulic controls Contact mechanic or supervisor Do not enter

ANE-35154
Quick add

Out of service Do not use

ANE-31880
Quick add

Out of service for repairs

ANE-31881
Quick add

Pinch hazard Keep hands away from moving parts Disconnect and lockout power prior to servicing

ACE-32865
Quick add

Pinch hazard Keep hands away from moving parts Disconnect and lockout power prior to servicing

ADE-32865
Quick add

Pinch hazard Keep hands away from moving parts Disconnect and lockout power prior to servicing

ANE-32865
Quick add

Pinch hazard Keep hands away from moving parts Disconnect and lockout power prior to servicing

AWE-32865
Quick add

Multiple saw blades Lock out machine and use extreme care when servicing

ABE-32799
Quick add

Multiple saw blades Lock out machine and use extreme care when servicing

ACE-32799
Quick add

Multiple saw blades Lock out machine and use extreme care when servicing

ADE-32799
Quick add

Multiple saw blades Lock out machine and use extreme care when servicing

ANE-32799
Quick add

Multiple saw blades Lock out machine and use extreme care when servicing

AWE-32799
Quick add

Saw blade present Disconnect power and lock out before servicing or making adjustments

ACE-32823
Quick add

Saw blade present Disconnect power and lock out before servicing or making adjustments

ADE-32823
Quick add

Saw blade present Disconnect power and lock out before servicing or making adjustments

ANE-32823
Quick add

Saw blade present Disconnect power and lock out before servicing or making adjustments

AWE-32823
Quick add

STOP machinery to clean, oil or repair - DETENGA las máquinas para realizar trabajos de limpieza, lubricación o reparación

ACB-5900-R
Quick add

Circuits within this energy source have been locked out Only the individual who has signed the lock/tag can re-energize these circuits Name ____ Phone ____

ANE-29971
Quick add

Cooling tower disconnect is served by multiple energy sources which must be isolated & locked out Prior to servicing verify that energy sources have been isolated

ANE-29976
Quick add

LOTO in place Fuses removed

ANE-30051
Quick add

Do not climb onto belts until emergency stop has been pushed and locked out

ANE-28362
Quick add

Lockout machine any time guards are to be removed

AWE-28628
Quick add

Lock out here

AWE-28647
Quick add

Hazardous Voltage Contact may cause electric shock or burn Turn off and lock out power before servicing

ACE-28582
Quick add

Live parts exposed within enclosure Isolate before removing cover

ACE-28614
Quick add

Lockout equipment prior to entry

ACE-28627
Quick add

Lockout machine any time guards are to be removed

ACE-28628
Quick add

Lock out here

ACE-28647
Quick add

Hazardous Voltage Contact may cause electric shock or burn Turn off and lock out power before servicing

ADE-28582
Quick add

Live parts exposed within enclosure Isolate before removing cover

ADE-28614
Quick add

Lockout equipment prior to entry

ADE-28627
Quick add

Lockout machine any time guards are to be removed

ADE-28628
Quick add

Live parts exposed within enclosure Isolate before removing cover

ANE-28614
Quick add

Hazardous Voltage Contact may cause electric shock or burn Turn off and lock out power before servicing

AWE-28582
Quick add

Permit required Confined space Lockout/Tagout required Do not enter

ACE-28505
Quick add

Permit required Confined space Lockout/Tagout required Do not enter

ADE-28505
Quick add

Permit required Confined space Lockout/Tagout required Do not enter

AWE-28505
Quick add

This equipment starts automatically Lockout required before removing any covers or guards

ACE-9515
Quick add

You must lockout/tag out baler before stepping on conveyor [left arrow]

ANE-28916
Quick add

You must lockout/tag out baler before stepping on conveyor [right arrow]

ANE-28917
Quick add

Hazardous Voltage Disconnect main power before servicing equipment - Alto Voltaje Desconecte la toma de corriente principal antes de realizar reparaciones

ADB-3567
Quick add

Suggested lock-out procedure 1. Announce lock-out to other personnel. 2. Turn power off at main panel. 3. Put key in pocket. 4. Lock-out power in off position. 5. Clear machine of all personnel. 6. Test lock-out by turning machine power switch to on. 7. Clear machine of personnel before restarting machine. 8. Take key from pocket. 9. Unlock the lock-out device. 10. Turn power on at main panel. 11. Announce machine is on to other personnel.

ASIE-25371
Quick add

Hazardous voltage Disconnect main power before servicing equipment

ADE-3567
Quick add

Do not switch on Men at work

AWE-25672
Quick add

Finger - Hand Hazard Disconnect main power before servicing equipment

AWE-8114
Quick add

Finger - Hand Hazard Disconnect main power before servicing equipment

ACE-8114
Quick add

The electrical power and source for this machine is ____ volts ____ phase from bus duct# ____ from bus duct plug# ____ Always follow lockout/tagout procedures

ADE-32542
Quick add

The electrical power and source for this machine is ____ volts ____ phase from bus duct# ____ from bus duct plug# ____ Always follow lockout/tagout procedures

ANE-32542
Quick add

Lab lockout

ANE-32543
Quick add

Entry is prohibited when hydrotester is operating Perform lockout & tagout before servicing

ANE-32544
Quick add

Lockout/tagout paddlewheel at all times when guard is removed or before entering reactor Paddlewheel may start or stop automatically Serious injury may occur from moving parts

ACE-32545
Quick add

Lockout/tagout paddlewheel at all times when guard is removed or before entering reactor Paddlewheel may start or stop automatically Serious injury may occur from moving parts

ADE-32545
Quick add

Lockout and tagout procedures must be in place before entry is made

ACE-32546
Quick add

Lockout and tagout procedures must be in place before entry is made

ADE-32546
Quick add

Lockout/tagout before servicing Refer to local energy isolation instructions

ACE-32547
Quick add

Lockout/tagout before servicing Refer to local energy isolation instructions

ADE-32547
Quick add

Lockout/tagout paddlewheel at all times when guard is removed Serious injury may occur due to moving parts

ACE-32548
Quick add

Lockout/tagout paddlewheel at all times when guard is removed Serious injury may occur due to moving parts

ADE-32548
Quick add

Main lockout/tagout point

ANE-32549
Quick add

No access unless conveyor is locked out

ADE-32550
Quick add

Non permit confined space Lockout/tagout required prior to entry

ANE-32551
Quick add

Please daisy chain locks

ANE-32552
Quick add

Reactor contains moving parts Lockout/tagout thrusters before entering

ACE-32553
Quick add

Reactor contains moving parts Lockout/tagout thrusters before entering

ANE-32553
Quick add

Reminder lockout is for our safety

ANE-32554
Quick add

Rotating auger inside this hopper Stop machine and follow your lockout procedures to adjust service or clean Keep hands, feet, hair and clothing away from rotating auger Failure may lead to serious injury or death

ACE-32555
Quick add

Rotating auger inside this hopper Stop machine and follow your lockout procedures to adjust service or clean Keep hands, feet, hair and clothing away from rotating auger Failure may lead to serious injury or death

ADE-32555
Quick add

Rotating auger inside this hopper Stop machine and follow your lockout procedures to adjust service or clean Keep hands, feet, hair and clothing away from rotating auger Failure may lead to serious injury or death

ANE-32555
Quick add

Rotating auger inside this hopper Stop machine and follow your lockout procedures to adjust service or clean Keep hands, feet, hair and clothing away from rotating auger Failure may lead to serious injury or death

AWE-32555
Quick add

Steam room lockout

ANE-32556
Quick add

Stop machinery before maintenance

ANE-32557
Quick add

The mill must be locked out before cleaning or reaching past the mill crown

ANE-32558
Quick add

Track Battery lockout/tagout blocks

ANE-32559
Quick add

Use lockout device during maintenance

ANE-32560
Quick add

De-energize and lock out boost system before entering this area

ANE-30261
Quick add

Electric shock hazard equipment may be powered by multiple sources Lock out all sources before servicing

ADE-30266
Quick add

Electric shock hazard equipment may be powered by multiple sources Lock out all sources before servicing

AWE-30266
Quick add

Electrical hazard Voltage or current sufficient to cause shock burn or death Disconnect and lockout power before servicing

ADE-30270
Quick add

Electrical hazard Voltage or current sufficient to cause shock burn or death Disconnect and lockout power before servicing

ANE-30270
Quick add

Hazardous voltage Contact may cause electric shock or burn Turn off and lock out system power before servicing

ADE-30281
Quick add

Lockout before entering

ACE-32530
Quick add

Lockout before entering

ADE-32530
Quick add

Maintenance door Machine will E-stop if opened Use proper lockout/tagout procedures before entering

ADE-32532
Quick add

Maintenance door Machine will E-stop if opened Use proper lockout/tagout procedures before entering

ANE-32532
Quick add

Maintenance use only

ANE-32537
Quick add

Lockout all machinery prior to servicing Failure to comply may result in disciplinary action

AWE-4325
Quick add

Machine under repair Do not operate

AWE-4415
Quick add

Lockout Tagout all power sources before removing guards

ADE-4315
Quick add

Lockout Tagout must be performed during setup, maintenance or repair

ADE-4320
Quick add

Lockout all machinery prior to servicing Failure to comply may result in disciplinary action

ADE-4325
Quick add